 |
 |
 |
ESTATE MANAGEMENT
1995
- Reconstruction and commissioning of central systems of conditioning, ventilation and heating of the museum building.
1996
- Establishment broad-band cable into connection to Internet.
- Complete replacement of museum building electroposting (general extent more than 10 thousand meters) ensuring safety, illumination of the exhibition show-cases and electric equipment.
1997
- Installation of an decorative fencing, outdoor decorative illumination of the front yard and establishment free-of-charge parking site for visitors' cars.
- Commissioning of automatic control and telemetering system of hot water supply and heating.
- Installation of the work in freezer capable to provide automatic maintenance of such temperature as minus 35 C in taxidermy laboratory.
- Waterproofing of the museum annex, leak damage repair on the area of 440 sq.m.
- Restoration and strenghtening of roof of the museum made of duralumin, waterproofing of window apertures of the roof.
- Emergency repair of a site of heating main, arranging of the museum yard.
- Installation of roof waterproof covering made from reinforced membrane by technology of firm “Carlile Sintec Sistems” (USA) on the area of 2400 sq.m.
- Installation of automated fire emergency system maintaining by computers.
1998
- Reconstruction of aerial and intensifying TV equipment.
- Facing of the museum yard borders with granite on the area of 500 sq. M.
- Improvement of water resistance of the roof on the area of 2300 sq. M.
- Improvement of annex waterproofing system and hurricane damage repair.
- Waterproofing of the museum annex by technology of firm “Carlile Sintec Sistems” (USA) with the purpose of leak prevention on the area of 450 sq. M.
- Reconstruction of central heating device.
1999
- Overhaul of refrigerating device of air conditioning system.
- Repair of annex waterproofing membrane.
- Inspection of the building designs and definition of the causes of deformation.
- Preventive tests of isolation resistance and ground connection checking.
- Repair of conditioning system, establishment its autonomous control system.
- Condition inspection of automatic gas fire suppression system.
2000
- Reinforsment of the foundation walls and walls of ventilating system.
- Central heating device overhaul.
- Overhaul of the second refrigerating device of air conditioning system.
|