ESTATE MANAGEMENT


1995
  1. Reconstruction and commissioning of central systems of conditioning, ventilation and heating of the museum building.
1996
  1. Establishment broad-band cable into connection to Internet.

  2. Complete replacement of museum building electroposting (general extent more than 10 thousand meters) ensuring safety, illumination of the exhibition show-cases and electric equipment.
1997
  1. Installation of an decorative fencing, outdoor decorative illumination of the front yard and establishment free-of-charge parking site for visitors' cars.

  2. Commissioning of automatic control and telemetering system of hot water supply and heating.

  3. Installation of the work in freezer capable to provide automatic maintenance of such temperature as minus 35 C in taxidermy laboratory.

  4. Waterproofing of the museum annex, leak damage repair on the area of 440 sq.m.

  5. Restoration and strenghtening of roof of the museum made of duralumin, waterproofing of window apertures of the roof.

  6. Emergency repair of a site of heating main, arranging of the museum yard.

  7. Installation of roof waterproof covering made from reinforced membrane by technology of firm “Carlile Sintec Sistems” (USA) on the area of 2400 sq.m.

  8. Installation of automated fire emergency system maintaining by computers.
1998
  1. Reconstruction of aerial and intensifying TV equipment.

  2. Facing of the museum yard borders with granite on the area of 500 sq. M.

  3. Improvement of water resistance of the roof on the area of 2300 sq. M.

  4. Improvement of annex waterproofing system and hurricane damage repair.

  5. Waterproofing of the museum annex by technology of firm “Carlile Sintec Sistems” (USA) with the purpose of leak prevention on the area of 450 sq. M.

  6. Reconstruction of central heating device.
1999
  1. Overhaul of refrigerating device of air conditioning system.

  2. Repair of annex waterproofing membrane.

  3. Inspection of the building designs and definition of the causes of deformation.

  4. Preventive tests of isolation resistance and ground connection checking.

  5. Repair of conditioning system, establishment its autonomous control system.

  6. Condition inspection of automatic gas fire suppression system.
2000
  1. Reinforsment of the foundation walls and walls of ventilating system.

  2. Central heating device overhaul.

  3. Overhaul of the second refrigerating device of air conditioning system.